亚洲av无码久久精品狠狠爱浪潮_高清精品一区二区三区_中文乱码字慕人妻熟女人妻_国产熟妇疯狂4p交在线播放_国产成人无码av

  • English
  • ???????
  • 中文
  • Fran?ais
  • Русский
  • Espa?ol

You are here

Selection of Decommissioning Strategies: Issues and Factors

Report by an Expert Group

IAEA-TECDOC-1478

English IAEA-TECDOC-1478 | 92-0-111705-1

52 pages | € 15.00 | Date published: 2005

Download PDF (861 KB)

Description

When selecting a proper decommissioning strategy in a specific facility, a range of general and site specific factors needs to be considered. These factors include cost, health and safety issues and environmental (HSE) impact, availability of resources, stakeholder involvement, etc. In some cases the lack of a single key resource could result in the elimination of some decommissioning strategies. Good practice may not always be achieved in Member States due to constraints or overruling factors such as a lack of funds or a lack of waste management infrastructure. Constraints or overruling factors are often attributable to inadequate decommissioning planning. This in turn may be due to inadequate legal and regulatory frameworks. Some relevant constraints and conditions have been evaluated. The objective of the evaluation is to identify key issues and to provide recommendations to Member States in which these constraints and factors prevail, to promote actions in support of good decommissioning practice.

More Information on reusing IAEA copyright material.

Stay in touch

Newsletter