亚洲av无码久久精品狠狠爱浪潮_高清精品一区二区三区_中文乱码字慕人妻熟女人妻_国产熟妇疯狂4p交在线播放_国产成人无码av

  • English
  • ???????
  • 中文
  • Fran?ais
  • Русский
  • Espa?ol

You are here

Ageing Management of Nuclear Power Plants During Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning

IAEA-TECDOC-1957

English IAEA-TECDOC-1957 | 978-92-0-107921-3

126 pages | 10 figures | € 18.00 | Date published: 2021

Download PDF (2.63 MB)

Description

As part of the IAEA programme on International Generic Ageing Lessons Learned (IGALL), this publication provides a summarized description of internationally accepted practices. Examples of the national approaches to ageing management for the specific periods of extended shutdown, delayed construction and post final shutdown as applied in the nuclear power plants of participating IGALL Member States are presented. In addition, some of the information is also applicable for the evaluation of ageing effects prior to and after restarting operation. The publication complements existing IAEA publications on ageing management approaches of Member States during normal operation and is intended for use by regulatory bodies, operating organizations, manufacturers, designers and technical support organizations.

More Information on reusing IAEA copyright material.

Keywords

Ageing, Management, NPP, Nuclear Power Plant, Delayed Construction, Extended Shutdown, Permanent Shutdown, Shutdown, Decommissioning, IGALL, International, Generic, Ageing, Lessons Learned, Ageing Management, Member State, Regulatory Body, SSC, Structures, Systems, Components, Ageing Effects, Acceptance Criteria, Corrective Action, Quality, Experience, Construction, Commissioning, Operation, Scope, Prevention, Detection, Monitoring, Mitigating, Trending, Feedback, ECC, Emergency Core Cooling, I&C, Instrumentation, Control, BWR, Boiling Water Reactor, LTO, Long Term Operation, PWR, Pressurized Water Reactor

Related publications

Stay in touch

Newsletter