亚洲av无码久久精品狠狠爱浪潮_高清精品一区二区三区_中文乱码字慕人妻熟女人妻_国产熟妇疯狂4p交在线播放_国产成人无码av

  • English
  • ???????
  • 中文
  • Fran?ais
  • Русский
  • Espa?ol

You are here

Regulatory Authorization and Related Inspections for Nuclear Security During the Lifetime of a Nuclear Facility

IAEA Nuclear Security Series No. 45-T
Nuclear Security Series

English STI/PUB/2016 | 978-92-0-127922-4

65 pages | 1 figure | € 52.00 | Date published: 2024

https://doi.org/10.61092/iaea.kkxl-qqqp

Download PDF (1.48 MB)

EPUB format available (1.94 MB)

Description

The development of a nuclear facility needs careful planning, adequate preparation and substantial investment. This includes the establishment of a legislative and regulatory framework with provisions to assess the adequacy of nuclear security and authorize activities at nuclear facilities at key stages in their lifetimes. This publication provides guidance to regulatory bodies responsible for the nuclear security of nuclear facilities on the authorization process for the operation of such facilities and for related activities. The guidance addresses nuclear security aspects that may require regulatory authorization during different stages in the lifetime of a nuclear facility, identifies the elements included in applications for authorization by the applicant or operator in each of these stages, and provides guidance to the regulatory body on the review and assessment of these applications and on related inspections as a basis for authorization decisions.

More Information on reusing IAEA copyright material.

Keywords

IAEA Nuclear Security, Regulatory Authorization, Related Inspections, Nuclear Security, Lifetime, Nuclear Facility, Safety Regulations, Nuclear Facilities, Safety Measures, Security Measures, Planning, Adequate Preparation, Substantial Investment, Legislative and Regulatory Framework, Adequacy of Nuclear Security, Authorize Activities, Key Stages, Regulatory Bodies, Authorization Process, Different Stages, Applications for Authorization, Operator, Assessment, Authorization Decisions, Basic Authorization Principles, Roles and Responsibilities, Applicant, Submission of Applications, Review, Siting, Design, Construction, Commissioning, Operation, Cessation, Decommissioning Stage, Design Modification, Regulatory Inspection, Enforcement Actions, Inspection Activities, Non-Compliance, Regulatory Requirements

Related publications

Stay in touch

Newsletter