亚洲av无码久久精品狠狠爱浪潮_高清精品一区二区三区_中文乱码字慕人妻熟女人妻_国产熟妇疯狂4p交在线播放_国产成人无码av

  • English
  • ???????
  • 中文
  • Fran?ais
  • Русский
  • Espa?ol

You are here

Design and Construction of Nuclear Power Plants to Facilitate Decommissioning

Technical Reports Series No. 382

English STI/DOC/010/382 | 92-0-100697-7

125 pages | 18 figures | € 32.00 | Date published: 1997

Description

This report provides guidance on the planning for decommissioning and on the provision of relevant features at the design and construction stages of nuclear power plants. Most of the information presented is equally applicable, however, to planning and implementing the decommissioning of research reactors and prototype reactors. The report will be useful in the context of backfitting and refurbishment of existing facilities.
Contents: 1. Introduction; 2. Policy and strategy considerations; 3. Radiological protection and optimization considerations; 4. Planning for decommissioning; 5. Documentation and records; 6. Basic design aspects; 7. Design features to facilitate decommissioning; 8. Conclusions; Annex I: National experience; Annex II: Problems encountered during decommissioning; Annex III: Case study on the evaluation of decommissioning facilitating features; Glossary.

More Information on reusing IAEA copyright material.

Stay in touch

Newsletter